Pallet and Container Build-Up Procedure

Five stages, in the order they are actually performed: check the ULD, plan the stack, fix the tie-downs, net it, then re-check before it moves. Each stage has a fail state you cannot recover from later by adding strap.

The stages

StageWhat is decided hereFailure mode
1. ULD airworthinessFrame, wheels, fittings and net condition before any cargo goes onA damaged fitting cannot take load; you find out when the build shifts
2. Stack planHeaviest low, centre of gravity near the centreline, contour respected at every levelTop-heavy builds pass the height check and fail the taper
3. Tie-down schemeReviewed by a qualified operator against the applicable proceduresStraps at a shallow angle provide little downward restraint
4. NettingNet tension, fitting engagement, coverage of the whole profileA net that does not engage every fitting is not a restraint
5. Completion checkFinal contour, weight, and documentation before releaseDiscovered after the ULD leaves the position

Work through the steps in the build-up guidePrep, layering and strapping with a completion checklist to run against the actual build.